Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2018 |
BUILDING - FINAL |
|
Approved |
|
| 09/06/2018 |
BUILDING - FINAL |
|
Correction Required |
Need Lic Arch or Eng letter to establish that the removed wall replaced with post and beam is adequate to bear the roof purlin load that was once supported by a full bearing wall. Addressing the beam size, span, and loads. |
| 09/05/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
Called ahead PJ Willkins, no access. |
| 08/23/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
need power for final inspections may need a reconnect permit. |
| 08/13/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
CALLED AHEAD AT 9:45 ARRIVED AT 10:16. NO ONE ONSITE/NO ACCESS. NOT ABLE TO RETURN LATER IN THE AFTERNOON DUE TO WORKLOAD. |
| 07/31/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
|
| 07/31/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
No access, vacant, and no one around to access any requests for inspection. For further info call Rick H in Code Enforcement, 520 419-5354 |
| 12/29/2017 |
BUILDING - FINAL |
|
Not ready for Inspection |
|