Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2017 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 05/25/2017 | PLUMBING - GAS PRESSURE TEST | Denied | GUESTHOUSE 1) Carbon monoxide detector required in proximity of bedroom 2) T&P relief line is plugged closed @ exterior elbow MAINHOUSE 3) Furnace enclosure requires suffcient combustion air. Sheet metal panel is closing off louver in door. 4) Pressure test not holding |