Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 06/14/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- DWV WATER TEST PROVIDED FOR THE NEW BATROOM ONLY.. 2- SHALL RED LINE THE PLAN SHOWING THE UNDERGROUND PLUMBING REVISION. 3- AUTOMATIC WASHER WASTE LINE IS NOT INSTALLED AT THIS TIME. |