Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2017 | PLUMBING - ROUGH, SOIL | Approved | OK TO BACKFILL DWV. | |
| 06/16/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- SHALL PROVIDE A SPECIALTY MISSION COUPLING ON AOUTOMATIC WASHER VENT CONNECTION. 2- SHALL MINIMUM OF TWO TIMES THE PIPE DIAMETER FOR THE AUTOMATIC WASHER TRAP ARM. 3- SHALL MAKE A PROPER SILLPHOS JOINT UNDER THE SLAB ON THE 1/2" COPPER SUPPLY CONNECTIONS. 4- SHALL PROVIDE AN APPROVED METHOD OF SUPPORT AND STRAPPING ON THE WASTE AND SOIL LINES AT GUEST SUITE BATHROOM. 5- SHALL LOCATE THE HORIZONTAL VENT FOR THE SHOWER WASTE LINE A MINIMUM 6" ABOVE THE FLOOD LEVEL RIM OF THE FIXTURE. NOTE; OKAY TO COVER THE P.O.C. OF KITCHEN WASTE BRANCH LINE. |