Permit: T17CM03902

Parcel: 124071390


Addresses:

55 N PARK AV


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T17CM03902

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
08/05/2019 PLUMBING - ROUGH, SOIL Approved
09/12/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #1, WASTE AND VENT LINES FOR ROOMS. OK TO COVER PROGRESS AREAS.
08/16/2018 PLUMBING - ROUGH, SOIL Partial Approval INFORMATION ONLY.
05/15/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #3, 2 @ 4" LINES AND 2 @ 6" LINES AT GL: Y - Z/1 - 6. OK TO COVER PROGRESS AREA.
04/23/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #3, GL: Y-Z/6-17; 2" - 4" LINES; OK TO COVER PROGRESS AREAS.
04/11/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #1, GL: 14 - 17/G-N: 2" - 4" LINES. OK TO COVER.
03/29/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #2, GL: 1-12/I-N; 2" - 8" LINES (MAIN AND LATERALS). OK TO COVER PROGRESS AREA.
03/28/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection CONTRACTOR CANCELLED.
03/27/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection CONTRACTOR CANCELLED.
03/23/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #1, 4" - 6" MAIN LINES AND LATERAL LINES AT GL: 15-16/G-N. OK TO COVER PROGRESS AREAS.
03/22/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #2, GREASE TRAP #1 AT GL: 8.3/B. OK TO COVER TRAP.
03/19/2018 PLUMBING - ROUGH, SOIL Partial Approval WASTE AND VENT LINES (2" - 4") AT GL: F-I/3-9. OK TO COVER PROGRESS AREA.
03/13/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #3, MAIN LINES, 4" - 6". OK TO COVER PROGRESS AREA.
03/08/2018 PLUMBING - ROUGH, SOIL Partial Approval MAIN LINES AND LATERALS IN BUILDING #1: GL: A-G/14-17. OK TO COVER PROGRESS AREAS.
03/07/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection CONTRACTOR CANCELLED - SYSTEM LEAKING UNDER FOOTING.
03/06/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection SYSTEM HAS SEVERAL LEAKS - WILL RECALL FOR INSPECTION.
02/28/2018 PLUMBING - ROUGH, SOIL Partial Approval FLOOR DRAINS (4" PVC LINES) AT GL: N-P/15-17. OK TO COVER PROGRESS AREAS.
02/23/2018 PLUMBING - ROUGH, SOIL Partial Approval 4" DRAIN LINES (GARAGE) AT GGL: 12 - 17/N - W. OK TO COVER PROGRESS AREAS.
02/20/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #2: PART "A"; GL: A - G/1 - 12 (2" - 4" - 6" - 10") TIE-IN TO GARAGE. GARAGE : GL: N - Y/1 - 11. OK TO COVER PROGRESS AREAS.
02/16/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection rain day
02/15/2018 PLUMBING - ROUGH, SOIL Cancelled CONTRACTOR CANCELLED - RAINED OUT.
02/05/2018 PLUMBING - ROUGH, SOIL Partial Approval BUILDING #1: 6" AND 4" WASTE LINES AT GL: A - I/14 - 17. OK TO COVER PROGRESS AREAS.