Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T17CM03857
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/15/2019 | BUILDING - FINAL | Approved | ||
05/03/2019 | BUILDING - FINAL | Not ready for Inspection | Locked up, no one home | |
04/24/2019 | BUILDING - FINAL | Not ready for Inspection | canceled | |
12/04/2018 | BUILDING - FINAL | Partial Approval | comply with notes 5 and 6 from engineer | |
09/06/2018 | BUILDING - FINAL | Not ready for Inspection | ||
05/29/2018 | BUILDING - FINAL | Not ready for Inspection | elec. conduit and condensate piping to be elevated 1.5" above roof provide roof jacks at elec. penetration through roof coat PVC for U.V. protection verify footers open dirt, under slab at footer locations |