Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2018 | ROOF NAILING | Approved | ||
| 05/29/2018 | ROOF NAILING | Not ready for Inspection | elec. conduit and condensate piping to be elevated 1.5" above roof provide roof jacks at elec. penetration through roof coat PVC for U.V. protection verify footers open dirt, under slab at footer locations |