Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T17CM03789
Inspection Description - FRAMING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2019 | FRAMING | Approved | Work is covered; no visible violations. | |
| 05/21/2019 | FRAMING | Partial Approval | All but screws in RC channel. | |
| 05/17/2019 | FRAMING | Denied | Work not being completed, another failed inspection will result in a reinspection fee. | |
| 05/17/2019 | FRAMING | Denied | Work not being completed, another failed inspection will result in a reinspection fee. | |
| 05/15/2019 | FRAMING | Denied | Fire stop above ceiling broken or not properly installed or sealed, wiring not properly sealed or nail plated, plumbing not on test, sealed through penetrations, mechanical ducts pinched off, boot box is not properly framed in, condensate vent to be above drain pan, exhaust duct not completed RC channel not to be hung with sheet rock screws, inspections stopped at this time too many items to list, this is not a Complete list. | |
| 05/08/2019 | FRAMING | Correction Required | 1-Need to patch drywall hole cut out above ceiling in kitchen and several holes around AC lines near West end (no unit numbers marked to identify). | |
| 05/03/2019 | FRAMING | Partial Approval | Third floor. | |
| 12/19/2018 | FRAMING | Partial Approval | Porch decking on second floor. | |
| 12/12/2018 | FRAMING | Partial Approval | Second floor deck for main building only; porches not ready | |
| 10/16/2018 | FRAMING | Partial Approval | First floor deck and trusses OK | |
| 10/12/2018 | FRAMING | Cancelled | Too slippery with rain to perform safe inspection |