Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2019 |
ENGINEERING - FINAL |
|
Approved |
|
| 04/25/2019 |
ENGINEERING - FINAL |
|
Partial Approval |
OK FOR TCO AT THIS TIME FINAL NOT TO BE GIVEN TILL THE DP17-0083 IS COMPLETE AND FINAL |
| 04/12/2019 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
This inspection was scheduled today for a preliminary inspection for future see a vote or future temporary Certificate of occupancy. I have advise the contractor of work that Will need to be completed before I come back to do a future in inspection for the TCO. |