Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2017 | FRAMING | Approved | ||
| 08/24/2017 | FRAMING | Denied | 1. UPPER STAIR PLATFORM, 2ND LANDING - NORTH JOIST IS NOT SUPPORTED. 2. LOWER MIDDLE STRINGER IS NOT SUPPORTED WITH A 2X HEADER. OSB IS NOT ACCEPTABLE ON ITS OWN. 3. NAIL REAR GARAGE SHEAR WALL. 4. MOVE PEX FROM KIT. CAN LIGHT AND FROM DIRECTLY ABOVE CAN LIGHT IN DOWNSTAIRS HALLWAY. 5. DRAFT STOP 2ND STORY DUCT CHASES. 6. HVAC FHA PLATES NEED FRAMING NAILS. |