Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 08/17/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | COVER ABS ON WALL WITH SHEET METAL. PROVIDE BRICK PAVERS OVER ABS IN COURTYARD. EXTEND COPPER PIPE BELOW GROUND WHERE CONNECTED TO PEX. | |
| 08/14/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- SHALL PROVIDE A RMEX STAPLE WITHIN 6 INCHES OF THE RECEPTICAL BOXES. 2- SHALL PROVIDE THE APPROVED MATERIAL FOR ALL EXPOSED PLASTIC WASTE PIPING. 3- SHALL PROVIDE A MINIMUM OF 12 INCHES OF COVER OR PROVIDE APPROVED MATERIAL. 4- NO EXPOSED WATER PEX PIPING ALLOWED. |
|
| 08/11/2017 | PLUMBING - ROUGH, SOIL | Denied | NO ACCESS AND NO PLANS ON SITE. |