Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T17CM03522
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2017 | ELECTRIC - FINAL | Approved | ||
06/15/2017 | ELECTRIC - FINAL | Denied | 1- THE APPROVED PLANS CALL FOR A 3" VENT THRU ROOF. 2- SHALL COMPLETE THE DRYER VENT. 3- SHALL PROVIDE A WATER TEST ON THE DWV SYSTEM IN THE PONY WALL. 4- SHALL PROVIDE PROTECTION OF COPPER WATER LINES THAT5 COME IN CONTACT WITH THE DRYER VENT. 5- SHALL PROVIDE A LOCK OUT TAG OUT CLIP ON THE WATER HEATER CIRCUIT BREAKER. |