Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2019 | FIRE SPKLR - FINAL | Approved | ||
| 04/04/2019 | FIRE SPKLR - FINAL | Partial Approval | OK FOR TCO | |
| 03/27/2019 | FIRE SPKLR - FINAL | Approved | ||
| 03/25/2019 | FIRE SPKLR - FINAL | Partial Approval | 209 PSI at the roof for OH Hydro of the 5th floor Need to complete the following for final: NFPA 14 Contractor's Material and Test Certificate for Aboveground Piping A sign shall be provided that indicates the pressure required at the inlets to deliver the standpipe demand. Outside/ weather proof (metal) 1" letters/numbers |