Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2019 |
ELECTRIC - UNDERGROUND |
|
Approved |
approval is for conduit under front patio slab |
| 03/19/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Five each light pole caissons with electric conduits. |
| 03/12/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
pole bases at entry only |
| 03/11/2019 |
ELECTRIC - UNDERGROUND |
|
Not ready for Inspection |
Work not complete at pole bases |
| 02/15/2019 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
9 x 3/4” site lighting from switchgear to nw corner |
| 05/29/2018 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
utility U.G. ok to cover |
| 05/24/2018 |
ELECTRIC - UNDERGROUND |
|
Not ready for Inspection |
Gate Locked at 4pm |
| 04/25/2018 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
from room 116 to switch gear risers ok to backfill |
| 12/01/2017 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
vert to 225 ok, elec. room 116 ok |
| 11/22/2017 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
U.G. at IDF room out ok |
| 11/17/2017 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
rm 116, IDF room, panel in I.T. room |