Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2017 | PLUMBING - FINAL | Approved | CLEAR GAS METER. | |
| 05/03/2017 | PLUMBING - FINAL | Denied | 1- SHALL SCRAPE THE PAINT OFF OF THE GAS LINE TO PROVIDE A POSITIVE BOND CONTACT FROM THE GROUND CLAMP TO THE PIPE. 2- SEE NOTE # 3 AS REQUESTED. |
|
| 04/27/2017 | PLUMBING - FINAL | Partial Approval | 1- GAS PRESSURE TEST PROVIDED. 2- UNDERGROUNG POLYETHELYNE GAS LINE UNDER GROUND IS OKAY,TRACER WIRE PROVIDED. 3- NOTE; 1- WATER HEATER FLU VENT HAS A OPEN GAP IN VENT AND REQUIRES THAT ALL FLU VENT JOINTS TO BE SECURED WITH (3) SHEET METAL SCREWS PER JOINT. 2- SHALL BOND THE GAS LINE. 3- WATER HEATER T & p DRAIN IS UNDERSIZED AND SHALL TERMINATE INTO THE DRIP PAN. 4- SHALL PROVIDE HARD PIPE THROUGH THE FURNACE HOUSING THEN CONNECT THE FLEX CONNECTOR. |