Permit: T17CM03229

Parcel: 125170100

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
04/28/2017 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
04/26/2017 PLUMBING - GAS PRESSURE TEST Denied 1- CHECK THE SYSTEM FOR LEAKS, THE TEST GAGE DROPPED PRESSURE DURING THE INSPECTION.
2- SHALL PROVIDE APPROVED MATERIALS FOR THE WATER HEATER T & P DRAIN AND TERMINATE IT TO DAYLIGHT AT 6 INCHES ABOVE GRADE.
3- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE WATER HEATER AND FURNACE FLU VENTS AT EACH JOINT AND DRAFT COLLAR.
4- SHALL BOND THE GAS LINE.