Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
10/13/2017 BUILDING - FINAL Approved
10/12/2017 BUILDING - FINAL Partial Approval SPECIAL INSPECTION CERT MISSING
10/05/2017 BUILDING - FINAL Partial Approval NEED DOUBLE STAMP AND ENERGY CERTS
07/18/2017 BUILDING - FINAL Not ready for Inspection Clothes dryer shall be elevated er code section 1307.3. and Install Instructions; raise dryer vent connection to 18".
Redline all changes on your approved plan including change for mechanical system, condensate, washer and dryer location, and grey water with revision to follow prior to final. Vehicular protection required per;IRC M1307.3.1.