Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2017 | FRAMING | Approved | ||
| 06/28/2017 | FRAMING | Partial Approval | Still need topplt repr at line set and dryer vent | |
| 06/27/2017 | FRAMING | Not ready for Inspection | Top plate repairs Clearance, slope and support B-vent Provide approved, listed metal pipe clamps on metal gas pipe as required per minimum codes and standards. |