Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2017 | MECHANICAL - FINAL | Approved | ||
| 05/11/2017 | MECHANICAL - FINAL | Partial Approval | HEAT STRIP UNDERFUSED. PROVIDE A GFI SERVICE RECEPTACLE WITH BUBBLE COVER. PROVIDE A ROOF JACK AT ELEC. THROUGH ROOF. PROVIDE THE REQUIRED STRUCTURAL DRAWING FOR NEW ROOFTOP A/C. EXTEND CANVAS COVER TO BOTTOM OF DUCT ON EAST SIDE OF UNIT. BLOCK AND CLAMP CONDENSATE DRAIN EVERY 4'. |