Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2017 | PLUMBING - FINAL | Approved | CLEAR GAS METER | |
| 04/20/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE DOUBLE WALL FLU VENT AND CAP FOR THE WATER HEATER. 2- SHALL EXTEND THE T & p DRAIN AND TERMINATE 6" ABOVE SUB GRADE. 3- SHALL PROVIDE A PERM CAP AT THE RANGE SUPPLY OUTLET. 4- SHALL SEAL THE GAS LINE PENETRATION THRU THE REAR WALL. 5 SHALL PROVIDE A CARBON MONOXCIDE DETECTOR. |