Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T17CM02530
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2018 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
07/24/2018 | BUILDING - FINAL | Partial Approval | ADA WATER CLOSETS MAY NOT EXCEED 18: FROM ANY WALL OK TO APPLY FOR C OF O |
|
07/11/2018 | BUILDING - FINAL | Partial Approval | rooms 5,6,7,8 occupency pending air balance approval | |
03/23/2018 | BUILDING - FINAL | Partial Approval | 1 WRAP PLUMBING IN RESTROOMS 2 COMPLETE GYM 3 INSTALL WHEEL CHAIR LIFT AND GUARDS AT STAGE 4 INSTALL LADDER UPS 5 INSTALL ALL REQUIRED SIGNAGE 6 COMPLETE ELEVATOR OK TO ISSUE TEMP CO PENDING ALL DEPT APPROVALS | |
03/21/2018 | BUILDING - FINAL | Denied | COMPLETE ROOF DRAINS PROVIDE ALL EXTERIOR GUARD RAILS PENDING AIR BALANCE REPORT AND METHOD OF STERILIZATION TO BOB SHERRY IN OFFICE BETWEEN 8AM AND 9:30 AM PENDING FIRE ND ENGINEERING FINALS CHECL ALL BOLTS AT STAIRWELL COMPLETE ELEVATOR STOPPED INSPECTION |