Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T17CM02517
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2018 | ENGINEERING - FINAL | Approved | ||
07/23/2018 | ENGINEERING - FINAL | Partial Approval | OK FOR THE TCO AT THIS TIME. COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS. HANDICAP LOCATIONS ON THE WEST SIDE OF THE SITE ARE NOT COMPLIANT AT THIS TIME FOR THE SLOPES VALUES IN VARIOUS LOCATIONS. | |
08/05/2017 | ENGINEERING - FINAL | Partial Approval | AFTER HOURS INSPECTION PERFORMED TODAY TO ENSURE ALL ITEMS ARE READY FOR THE TEMPORARY C OF O. OK FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY AT THIS TIME. CANYON WILL CLOSE UP THE REMAINDER OF THE TEMPORARY FENCING BEFORE THEY LEAVE AT THE END OF THIS DAY. THE PERMANENT BARRIER RAILING WILL BE INSTALLED NEXT WEEK AND ALL THE TEMPORARY FENCING WILL BE REMOVED ALONG THE WALKWAY NORTH OF THE BATHROOM ADDITION. THEY HAVE PROVIDED TWO ADDITIONAL SPACES EAST OF THE PEDESTRIAN GATE ACCESS AT THE SOUTHWEST CORNER OF THE SITE, THE EASTERN PARKING SPACE IS NON COMPLIANT, IT EXCEEDS THE 2% MAXIMUM CROSS SLOPE IN THE RUNNING SLOPE OF THE PARKING STALL. THIS PARKING SPACE MARKINGS WILL BE REMOVED AT A LATER DATE THIS NEXT WEEK. |
|
08/03/2017 | ENGINEERING - FINAL | Not ready for Inspection | SITE IS NOT READY AT THIS TIME FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY. FOLLOW IS A LIST OF ITEMS INCOMPLETE AT THIS TIME, THIS IS NOT TO BE CONSIDERED A FULL LIST OF INCOMPLETE ITEMS, BUT THE ITEMS THAT ARE NEEDED FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY. 1) COMPLETE ALL SIDEWALKS AROUND THE BUILD FOR PEDESTRIAN OR PROVIDE A PROTECTIVE BARRIER TO PREVENT ACCESS INTO THE CONSTRUCTION ZONES. 2) COMPLETE ALL WALKWAYS FOR THE TEMPORARY WALKWAYS AND BARRIER/PEDESTRIAN RAILINGS AROUND THE MODULAR STRUCTURES FROM THE CONCRETE SIDEWALKS. 3) PROVIDE A SECOND ACCESSABLE PARKING SPACE FOR THIS SITE SINCE THE ONE SHOWN ON THE APPROVED PLANS HAS BEEN COVERED OVER BY THE METAL WALKWAYS. 4) REMOVE ALL EXCESS CONSTRUCTION MATERIALS, STORAGE BINS, TRASH, AND DEBRIS FROM ALL AREAS THAT ARE TO BE UTILIZED BY THE SCHOOL, AND PARENTS IN THE SOUTHERN AND WESTERN PARKING AREAS. 5) ALL CONSTUCTION ACCESS NEEDS TO BE FENCED OFF FROM THE GENERAL PUBLIC TOO PREVENT ACCESS INTO THE CONSTRUCTION AREA. IF ANY OF THE SITE IS TO CHANGE DURING THE REMAINING CONSTRUCTION PLEASE FEEL FREE TO CONTACT ME DAVID ROBERTS AT (520) 349-7643 AND ASK THAT I MEET YOU ON SITE TO DETERMINE WHAT OTHER PROTECTIVE MEASURES THAT MAY NEED TO BE TAKEN FOR PUBLIC SAFETY. THIS INSPECTION WILL BE PERFORMED AGAIN ON 8/5/2017 AT THE END OF THE DAY TO SEE IF A TEMPORARY CERTIFICATE OF OCCUPANCY CAN BE ISSUED FOR THIS SITE. |