02/26/2020 | ENGINEERING - FINAL | Approved | THE CROSS SLOPES OF THE SIDEWALK EXCEEDS THE MAXIMUM ALLLOWABLE CROSS OF 2% FOR COMPLIANCE, THEY ARE CURRENTLY BETWEEN 2% AND 3%. THIS SITE IS BEING APPROVED AT THIS TIME DUE TO THE E-MAIL RECIEVED FROM THE BUILDING OFFICIAL ON THIS DATE AT 6;49 AM ON THIS DATE AS POSTED BELOW: Dave, I have an appeal for the SFR project out in Wildcat Pass that I will be approving. It allows cross slopes for the sidewalks up to 3%. I'm comfortable with their installation as long as they can pull a car up the driveway without hitting the front bumper. I couldn't verify that yesterday because they still had a pile of sand there when I went out. Please prepare to close this activity out as the loan must close today. Thank you THE VERIFICATION OF THE ACCESS REQUIREMENT CAN NOT BE COMPLETED AT THIS TIME SINCE THE STOCKPILE OF SAND REMAINS IN PLACE AT THE TIME OF THE INSPECTION. |
|
02/19/2020 | ENGINEERING - FINAL | Denied | 1. VERIFY CONTINUOUS INTERCEPTOR AROUND ROCK SLOPE AT REAR OF RESIDENCE PER DETAIL A. 2. VERIFY SLOPE OF ROCK WALL AT FRONT OF PROPERTY MAX 1:1.5 |
|
02/18/2020 | ENGINEERING - FINAL | Denied | I CAME TO THIS SITE TODAY TO TAKE SOME CROSS SLOPE READINGS OF THE SIDEWALKS AND DRIVEWAY FOR THIS SITE SO THAT THIS INFORMATION CAN BE PASSED ONTO THE BUILDING OFFICIAL AS WELL AS TO THE REVIEW STAFF TO TRY AND DETERMINE WHAT CAN BE DONE WITH THIS SITE TO MAKE IT MEET THE COMPLIANCE FOR ADA. | |
02/14/2020 | ENGINEERING - FINAL | Denied | I WALKED THE SITE WITH THE CONTRACTOR FOR THE FINAL APPROVAL, BUT AM UNABLE TO PASS IT AT THIS TIME SINCE IT WAS CONSTRUCTED WITHOUT A DEVELOPMENT PACKAGE AS PREVIOUSLY NOTED. CURRENTLY THE BIG ISSUE OUTSIDE OF THE LACK WITHOUT A PERMIT IS THAT THE SIDEWALK AND DRIVEWAY ARE NON COMPLIANT AND NEED TO BE ADDRESSED PRIOR TO THE FINAL APPROVAL OF THIS SITE. I HAVE ASKED THE CONTRACTOR TO CONTACT HIS ENGINEER FOR THIS SITE AND ARRANGE TO GO DOWNTOWN AND DISCUSS THIS SITE WITH STEVE SHIELDS / ZONING AND JOHN VAN WINKLE WITH ENGINEERING TO TRY AND DETERMINE WHAT IS GOING TO BE REQUIRED TO CLOSE OUT THIS PROJECT. THE CROSS SLOPE OF THE SIDEWALK VARIES FROM 1.5% TO 15% AT VARIOUS LOCATIONS, THESE EXCEED THE MAXIUM ALLOWABLE OF 2%. THIS INSPECTION WAS TO BE CHARGED A SAME DAY INSPECTION FEE, BUT I HAVE NOT CHARGED THIS FEE DUE TO THE FACT THAT THE SITE IS NOT READY TO BE APPROVED. WE LOOKED AT VARIOUS SITUATIONS IN WHICH HE MIGHT BE ABLE TO ACHIEVE THE ADA COMPLIANCE, HE WILL DISCUSS THIS SITE WITH THE ARCHITECT FOR THE SITE AND THEN WILL MEET WITH THE REVIEW STAFF DOWNTOWN TO FIND THE BEST SOLUTION. |
|
10/23/2019 | ENGINEERING - FINAL | Denied | Jesus at 784 1258, Gate code 1968. Tim Robertson designer. Will provide a fix where needed and will resubmit as built drawings for city approval, and then will reschedule the inspection. Accessible sidewalk along private street has 15.1% cross slope. Retaining wall in the front has not been built and the Rocky slope is eroding, and rocks have rolled down the hill and onto the sidewalk. The drainage swale behind the property was not installed as shown on the site plan. Call for all inspections required under DP16 0222. |
|
05/01/2019 | ENGINEERING - FINAL | Denied | THIS INSPECTION WAS IGNITIATED AT THIS TIME BECAUSE THE SITE IS BEING CONSTRUCTED WITUOUT THE USE OF A DEVELOPMENT PACKAGE OR GRADING PERMIT. I HAVE ADVISED JOHN VAN WINKLE OF THE ISSUES THAT I HAVE NOTED AS BEING NON-COMPLIANT, THESE WILL NEED TO BE ADDRESSED PRIOR TO THE ISSUANCE OF THE COMPLETION LETTER FOR THIS RESIDENCE. |