Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2017 | PLUMBING - INTERMEDIATE | Approved | ||
| 12/28/2017 | PLUMBING - INTERMEDIATE | Denied | 1 shim bearing headers 2 install diamond mesh on horizontal surfaces greater than 12" 3 pancake boxes at garage overfilled 4 ground metal box atbreakfast nook 5 bond spa motor 6 provide min 12" from can light to pex in bath 3 7 trap arm in laundry overlength 8 provide gas gauge with 1/10th pound increments 9 provide insulation shield on fireplace vent | |
| 12/13/2017 | PLUMBING - INTERMEDIATE | Denied | SECURE 90 VENTS THRU ROOF SECURE CLOSET FLANGE NAIL PROTECT THROUGHOUT |
|
| 12/06/2017 | PLUMBING - INTERMEDIATE | Partial Approval | FIRE FOAM ALL TOP PLATE PENETRATIONS STUB OUT FUTURE SOLAR AT WATER HEATER BOND GAS LINE SECURE LINE SETS VERTICAL IN WALLS SECURE 90 VENTS THRU ROOF EXCEPT JACUZZI TUB PROVIDE 12" CLEARANCE PEX FROM CANS |
|
| 11/28/2017 | PLUMBING - INTERMEDIATE | Not ready for Inspection | LATHE PRIOR |