Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/26/2020 |
BUILDING - FINAL |
|
Approved |
|
| 10/23/2019 |
BUILDING - FINAL |
|
Partial Approval |
APPROVED BY INSPECTOR, AWAITING ENGINEERING FINAL APPROVAL. |
| 02/15/2019 |
BUILDING - FINAL |
|
Not ready for Inspection |
need address on house. Smoke alarms outside of sleeping areas need to be both smoke and carbon or a separate carbon detector due to attached garage. Missing hardware at exterior furnace door. Need prior corrections figured addressed as the last inspection was more than a year ago. Need drawings on site. Need special inspection paperwork and fire sprinkler inspection approval paperwork onsite. After speaking with contractor I made a recommendation having all his paperwork up-to-date and on-site and meeting inspector at the house. |