Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2018 | BUILDING - FINAL | Approved | CORRECTIONS MADE EXCEPT BASEMENT, WHICH IS TO BE PERMITTED SEPERATELY PER PROJECT MANAGER | |
| 06/12/2018 | BUILDING - FINAL | Denied | BASEMENT WH, WINDOW, STORM DRAIN, FRAMING 2106 KIT DUCT, ELEC COVERED IN CEILING, LABEL PANEL 2105 SAME 2208 SAME 2207 SAME |
|
| 06/08/2018 | BUILDING - FINAL | Cancelled | CONTRACTOR canceled |