Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2017 | PLUMBING - FINAL | Approved | ||
| 03/29/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE GAS BOND AS REQUESTED FROM PREVIOUS INSPECTION. SEE NOTE #1. 2- SHALL SEAL THE GAS LINE PENETRATION THRU THE EXTERIOR WALL. |
|
| 03/27/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE GAS BOND THAT IS CONNECTED TO THE ELECTRICAL GROUNDING SYSTEM. 2- SHALL EXTEND THE FURNACE FLU VENT AND TERMINATE A MINIMUM OF 3'-0" ABOVE THE COOLER WHEN THE B-VENT IS LOCATED WITHIN 10' RADIUS. 3- CHECK THE GAS LINE SYSTEM FOR LEAKS. |