Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2017 | FIRE - FINAL | Approved | ||
| 06/22/2017 | FIRE - FINAL | Partial Approval | Not ready. Needs the following: 1) need sprink final. 2) need fire alarm final. 3) hood needs to be interconnected to alarm panel. 4) obtain operational permit for "places of assembly" 5) add suite # to rear door. 6) repair exit signs x 3, EM light in lobby E. wall. 7) CO2 alarm and permit required if quantities over 100lbs. (bulk co2) 8) label door. "riser room" "FACP" 9) needs FDC locking knox cap. 10) needs knox box mounted outside riser room. |