Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2017 | ELECTRIC - FINAL | Approved | SKYPE DGC | |
| 04/21/2017 | ELECTRIC - FINAL | Partial Approval | PLANS SHOW THE 40 AMP BREAKER TO FEED THE LOAD CENTER, NOT THE 30 AMP. THE LOAD CENTER REQUIRES #8 WIRE. EVERYTHING ELSE IS OK. |
|
| 04/11/2017 | ELECTRIC - FINAL | Denied | NO ACCESS. |