Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2017 | BUILDING - FINAL | Approved | ||
| 06/12/2017 | BUILDING - FINAL | Not ready for Inspection | ||
| 06/09/2017 | BUILDING - FINAL | Denied | ABS glue may not be used on PVC. Pvc Primer and Solvent cement shall be used. Install Co Adaptor on upstream(house side) of "two way co". Correct slope on TPR drain. Remove tape from joints of vent connectors. Install lead roof jacks properly. Level Condensing unit. Install tube clamp on Dw pumped discharge hose. Bread bag tie is not acceptible. Dope may not be used on AAV |
|
| 06/08/2017 | BUILDING - FINAL | Not ready for Inspection | ok for gasclr |