Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 04/07/2017 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ||
| 04/06/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- THE APPROVED PLANS CALL FOR A 4" BLDG. DRAIN UP TO THE FIRST BRANCH LINE. 2- RE TEST SYSTEM. |