Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2019 | BUILDING - FINAL | Approved | phase 2 has an already approved CO. Apparently phase 2 is the whole project. This should not have been left as a partial under fire and building once corrections were fixed and engineering was approved. Therefore my approval is basically just clerical. | |
| 11/29/2017 | BUILDING - FINAL | Partial Approval | HANDI CAP SIGNS BATHROOMS VERTICAL GRAB BARS BATHROOMS INSTALL MIRRORS BATHROOMS PENDING FIRE AND ENGINEERING FINALS PROVIDE BALANCE REPORT AND METHOD OF STERILIZATION REPORT TO BOB SHERRY IN OFFICE FROM 8AM-9:30AM |