Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2017 | FIRE - FINAL | Approved | ||
| 09/26/2017 | FIRE - FINAL | Denied | 1) Addtional reinspection fee added. Must be paid prior to next inspection. 2) Obtain operational permit for CO2 and install CO2 alarm if you switch to bulk CO2, CO2 > 100lbs. 3) Obtain operational permit for "places of assembly" 4) Need 12" address numbers on bldg. 5) Need an annual sprinkler inspection report and 5yr check valve inspection report for sprinkler system. You can file an appeal to remove the system if you don't want to maintain it. It is no longer a required system. 6) Remove quarter turn locks on 2nd and 3rd exit doors, east side. 7) Install emergency lights 8) Install blank in open circuit breaker. 9) Repair drywall on backside wall of electrical panel A. 10) Repair drywall, ceiling, open hole towards rear of kitchen. 11) Open electrical above panel B, cover. 12) Install cover plates on all outlets. 13) Remove all old low voltage exposed wires in back office. 14) Replace all ceiling tiles. 15) Remove slidebolt on rear kitchen exit door. 16) Remove padlock hardware off rear walk-in cooler. 17) Repair exit signs, chevrons need to be corrected. 18) Repair all broken windows. |