Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2017 | MECHANICAL - INTERMEDIATE | Approved | ||
| 02/24/2017 | MECHANICAL - INTERMEDIATE | Denied | 1- provide bushing at disconnect 2- whitewire not to be used as a hot leg 3- T-stat wire to be protectd from U.V. damage 4- conduit to be blocked up a minimum of 1.5 inches 5- all roof top duct to have a minimum of R-8 isulation (2 inch) 6- provide P-trap at condensate drain 7- PVC pipe to be coated for U.V. protection 8- condensate pipe to be strapped to wall 9- service outlet required on roof within 25' of unit (110v) 10- all roof penetrations require roof jacks 11- PVC piping to be supported not more than 48" horiz. 12- breaker is over rated for this unit 13- provide proper fitting at top of panel, myers hub or equal |