Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2019 |
PLUMBING - FINAL |
|
Not ready for Inspection |
need to complete sinks in master bath. Need thermostatic digital multi outlet shower valve included in drawings as there is a receptacle within the wall which will not work. Also need drawings revised reflecting what was built, as drawings are no longer accurate, as tub was not installed, and an additional sink added. Also will need access to verify new circuits and sub panel are per drawing. |