Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2017 | FRAMING | Approved | ||
| 04/17/2017 | FRAMING | Denied | 1. bang plate tpr drain where needed. 2. bang plate pex and abs where needed. 3. support abs vent 90 degree above laundry. 4. screw toilet flanges to floor. 5. finish mesh a repair at patio. 6. caulk fascia/foam intersection. 7. secure top plate at stove vent. |
|
| 04/14/2017 | FRAMING | Denied | Approved plans and permit required to be on site |