Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2017 | FRAMING | Approved | ||
| 05/05/2017 | FRAMING | Not ready for Inspection | ||
| 05/03/2017 | FRAMING | Denied | correct over notch of ext wall top plates on both levels and for ABS as well as line set. softener drain termination mst be plumb over indirect waste receptor. Horizontal section of metal dryer uct requires a metal duct strap, or rivet both joints. |
|
| 05/02/2017 | FRAMING | Denied | 1.LARGE PROTECTIVE BANG PLATES ARE NOT STRUCTURALLY RE-INFORCING. FOR OVER BORES AND OVER NOTCHES, FHA STRAPS FULLY NAILED ARE REQUIRED. | |
| 05/01/2017 | FRAMING | Denied | top plate repair |