Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2017 | PLUMBING - GAS PRESSURE TEST | Approved | CLEAR GAS METER | |
| 01/31/2017 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE AN AIR PRESSURE TEST ON GAS LINE WITH A 15 LB-1/10 INCREMENT TEST GAGE WITH 10 LBS OF AIR TEST. 2- SHALL SECURE THE GAS LINE TO THE WALL. 3- SHALL PROVIDE DOUBLE WALL FLU VENT AND CAP FROM THE WATER HEATER DRAFT COLLAR UP THRU THE ENCLOSURE AND TERMINATE A MINIMUM OF 1'-0" ABOVE THE EVE. * |