Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2017 | PLUMBING - FINAL | Approved | ||
| 01/30/2017 | PLUMBING - FINAL | Not ready for Inspection | A PRESSURE TEST IS REQUIRED ON THE GAS LINE. EXTEND THE T&P LINE TO WITHIN 6" OF GROUND. EXTEND FLUE PIPE TO 2' ABOVE EDGE OF ROOF. |