Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2019 | BUILDING - FINAL | Approved | ||
| 10/16/2018 | BUILDING - FINAL | Correction Required | Call for framing, Clips next. Install lateral rotation blocks per plan Treated plate required at top of masonry wall (top plate). You may treat the existing with Copper Napthanate as a substitute. |
|
| 04/27/2018 | BUILDING - FINAL | Not ready for Inspection |