Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2017 | BUILDING - FINAL | Approved | ||
| 08/16/2017 | BUILDING - FINAL | Cancelled | IVRS - AP canceled | |
| 08/14/2017 | BUILDING - FINAL | Cancelled | IVRS - AP canceled | |
| 08/10/2017 | BUILDING - FINAL | Cancelled | IVRS - AP canceled | |
| 07/21/2017 | BUILDING - FINAL | Approved | ||
| 07/21/2017 | BUILDING - FINAL | Partial Approval | complete all 3rd party report | |
| 06/30/2017 | BUILDING - FINAL | Not ready for Inspection | Provide revised plan for Mech and structural changes to garage wall. Provide bollard for wh Terminate TPR drain vertically 6" abv grade. Expose Sewer cleanouts and seal all threaded connections. Ks vent missing AAV. DW not installed. Clean out plugs shall be listed to reciee screw Address not installed. Hot check recepts and GI, lablepanel. Tamper proof caps on AC required. |