Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2017 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/27/2017 | ELECTRIC - FINAL | Denied | 1-2 ground rods required 6' apart 2-bonding to gas and water required 3-2 points of connection to building required 4-address label at panel required 5-guyed wires required for mast over 36" |