Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2017 | FRAMING | Approved | ||
| 02/15/2017 | FRAMING | Partial Approval | 1- HAD A PRE CONSTRUCTION MEETING ON LOCATION OF THE HOLD DOWNS AND ALTERNATE METHOD OF INSTALLATION. |