Permit: T17CM00359

Parcel: 110113620

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
08/09/2017 EXCAVATION/LAYOUT REBAR & ZON Approved
07/06/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO POUR STEM WALL FOOTING AT THEATER 9 STADIUM SEATING.
OK TO BACKFILL ELEC. CONDUITS AT SERVICE ENTRANCE.
05/17/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO POUR PERIMETER FOOTINGS, 3 COLUMN FOOTINGS, & INTERIOR MASONRY FOOTING AT FULL HEIGHT WALL.
03/30/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK to pour column lines A.2/0.1 to G.3/0.5 -and- interior footings @ column line C.1 and the next one west -and- the stairwell.