Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2017 | PLUMBING - GAS PRESSURE TEST | Approved | APPROVED | |
| 01/24/2017 | PLUMBING - GAS PRESSURE TEST | Denied | COMPLETE PIPE TO HEATER ON ROOF SECURE PIPE TO BUILDING RE-TEST AIR PRESSURE |
|
| 01/18/2017 | PLUMBING - GAS PRESSURE TEST | Denied | UNDERGROUND GAS PIPE MUST BE FACTORY COATED. YOU ARE REQUIRED TO LEAVE AN AIR PRESSURE TEST ON GAS LINE FOR INSPECTION. I CALLED AND LEFT A MESSAGE, THERE WAS NO ANSWER AT FRONT DOOR. |