Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2017 | ENGINEERING - FINAL | Approved | ||
| 08/01/2017 | ENGINEERING - FINAL | Partial Approval | 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO ROOF DRAINAGE, DIRECTION OF FLOW, SCUPPER INSTALLATION, AND DOWNSPOUT INSTALL. 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) CALL FOR RE-INSPECTION |