Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2017 | BUILDING - FINAL | Approved | ||
| 08/11/2017 | BUILDING - FINAL | Denied | 1- SHALL PROVIDE GFI PROTECTION AT KITCHEN SINK COUNTER TOP AS PER PLAN. 2- SHALL POST THE ADDRESS ON BLDG. 3- SHALL PROVIDE LOCKING CAPS ON THE CONDENSER REFRIGERANT PORTS. 4- SHALL SNAP OFF THE SET SCREW ON THE FRONT HOSE BIB VACUUM BREAKER |
|
| 08/04/2017 | BUILDING - FINAL | Partial Approval | ALL NEW OUTDOOR LIGHTS MUST BE FULLY SHIELDED AS PER PLAN. PROVIDE ARC FAULT BREAKERS AND TAMPER PROOF RECEPTACLES AS PER PLAN. CAULK AROUND TOILET. |