Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA FINAL/BARRIER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2017 | POOL/SPA FINAL/BARRIER | Approved | IVRS - Inspection :* | |
| 12/22/2017 | POOL/SPA FINAL/BARRIER | Not ready for Inspection | IVRS - Inspection :* | |
| 12/21/2017 | POOL/SPA FINAL/BARRIER | Not ready for Inspection | Provide freeze protection for PVB and a backflow test report. Required per 2012 IRC |
|
| 12/20/2017 | POOL/SPA FINAL/BARRIER | Partial Approval | Provide a proper connection of bond wire to fence, bury wires. Provide freeze protection for PVB and a backflow test report. |
|
| 12/01/2017 | POOL/SPA FINAL/BARRIER | Cancelled | IVRS - RI canceled |