Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T16RW02956
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Final. | |
| 12/02/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with John-BST Concrete. Plan change should be coming through TDOT to change to 2 DW openings instead of one large one. | |
| 12/02/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Instructed contractor to modify site to comply with MUTCD guidelines on pedestrian access/saftey. Will comply with either a graded dilineated path through the north side of the jobsite, or by installing a water barrier on the south edge of the bike lane to protect pedestrian traffic. | |
| 12/02/2016 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | Not MUTCD compliant for pedestrian access. Contractor notified and instructed to provide safe ADA passageway through project. Contractor began grading a path around worksite at 3:00pm | |
| 11/30/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Onsite with Tom A to discuss plans for new DW apron. Permit does not specify enlargening of the DW apron. Existing shared use driveway is already at maximum allowable width per ch 25. Blood Sweat and Tears Concrete to ask general contractor on how to procede. |