Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | Alpha replaced 5 LF of sidewalk today. No issues. Job complete | |
| 12/19/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Clean up work, no concrete today so alpha could not repair sidewalk | |
| 12/19/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Area has 3 3x3 perm patches on Harrison, need stripping fixed | |
| 12/16/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Alpha boring under Harrison and potholing gas line. Alpha will need to repave pot holes and repair sidewalk on the East side of roadway | |
| 12/15/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/9/16 precon on site. Moratorium issues resolved, Tom wolfgang checked and said there was no issues 12/15/16 potholing started today, for upcoming boring |
|
| 12/15/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued |